MIL-HDBK-115B(ARMY) APPENDIX D
A. REVERSE ENGINEERING COSTS
1. REVERSE ENGINEERING PROCESS TOTAL HOURS X
COMPOSITE RATE =
2. COST OF RENTAL EQUIPMENT FOR ANALYSIS & TEST
3. LABORATORY COST (MATERIAL ANALYSIS)
4. DELAMINATION OF COMPLEX ELEX BOARDS
5. PROTOTYPE COST (AT LEAST ITEM UNIT COST) X UNIT QUANTITY
6. SPECIAL TOOLING COST (BEST ESTIMATE)
7. TOTAL ESTIMATED COST TO REVERSE ENGINEER
B. ESTIMATED PROCUREMENT COST
1. |
ESTIMATED PROCUREMENT COST PER UNIT |
|
2. |
ANNUAL BUY QUANTITY |
|
3. |
PRE-REVERSE ENGINEERING ANNUAL BUY VALUE |
|
(B.1 X B.2)
C. ESTIMATED ANNUAL SAVINGS AFTER ENGINEERING (25% X B.3)
D. ESTIMATED ANNUAL BUY VALUE AFTER REVERSE ENGINEERING
(B.3 - C)
E. FIRST YEAR COST AFTER REVERSE ENGINEERING (A.7 + D)
F. MINIMUM ESTIMATED COST (SAVINGS OR LOSS) OVER ESTIMATED REMAINING SERVICE LIFE OF
YEARS
(B.3)
Pre-Reverse |
|||
Engineering |
|||
Annual |
|||
Buy Value |
X |
Years |
MINUS |
(A.7) |
(D) |
||
Reverse |
Est. Annual Buy |
||
Engineering |
+ |
Value After Reverse X |
Years |
Cost |
Engineering |
FIGURE 4: Sample cost-estimating guide (see 5.11.3). (Page 2 of 5)
65
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business