MIL-HDBK-115B(ARMY)
PARAGARAPH PAGE
5.44 Additional engineering/logistical considerations………….. 36
5.44.1 Re-evaluate design……………………………………….…36
5.44.2 Follow-on considerations…………………………………...36
5.44.2.1 End-item TDP update…………………………………….... 36
5.44.2.2 Integrated logistics support (ILS)……………………......… 36
5.45 Engineering recommendations…………………………..… 36
5.45.1 Product improvement………………………………….....…36
5.45.1.1 Inadequate data………………………………………….…. 36
5.45.1.2 Engineering evaluation………………………………….…. 36
5.45.1.3 Product reliability………………………………………..… 36
5.46 Value engineering………………………………………..… 37
5.46.1 Value engineering objective……………………………..… 37
5.46.2 Documented results…………………………………..….… 37
5.46.3 Logistics support analysis/record………………………….. 38
5.46.4 Manual reviews………………………………………….… 38
6. NOTES
6.1 Intended use…………………………………………….….. 38
6.2 Subject term (key words) listing…………………………....38
6.3 Changes from previous issue…………………………….… 38
APPENDICES
Appendix A Acquisition method code/acquisition method suffix
code, definitions……………………………………..…..….39
Appendix B Data rights, definitions and valid legends………………..…43
Appendix C Engineering drawings (levels/types/content)……………… 50
Appendix D Reference documents………………………………….…....56
FIGURES
1. The reverse engineering process (5.1)…………………....... 59
2. Sample data call sheet (5.8.4)….……….………………..… 60
3. Sample test plan format (5.10)………….…………....….… 61
4. Cost-estimating guide No. 1 (5.11.3)…………..…………...64
5. Value engineering study and value engineering
proposal (5.46.1)…………………………………………... 69
CONCLUDING MATERIAL…………………………………..…. 71
vii
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business