MIL-HDBK-115B(ARMY)
REVERSE ENGINEERING ECONOMIC ANALYSIS
MECH ELEX HOURS HOURS
ITEM PER PER EST. NO. TOTAL NO. FUNCTION ITEM ITEM OF ITEMS EST. HRS
1 RECEIVE ITEM AND ENTER IN REVERSE ENGINEERING
MANAGEMENT SYSTEM (REMS) 2 2 1
2 REVIEW GFE & RETRIEVE
ADDITIONAL DATA 8 8 1
3 IDENTIFY/REVIEW TEST DATA.
VALIDATE OR DEVELOP TEST
PROCEDURES 40 120 1
4 IDENTIFY PARTS AND
DRAWINGS REQUIRED 8 24 1
5 DISASSEMBLE-CONDUCT PCA 24 24 1
6 DEVELOP SCHEDULE AND REVERSE
ENGINEERING PLAN 8 3 1
7 CONDUCT DIMENSION
ANALYSIS 2 4
8 DEVELOP LEVEL THREE
DRAWINGS 16 16
9 CONDUCT PRODUCIBILITY
AND Q/A ANALYSIS 12 24
10 REVIEW DRAWINGS AND
PROTOTYPE COST W/CUSTOMER .5 1.0
11 INITIATE PROCUREMENT ACTION FOR PROTOTYPE AND/
OR PARTS 3 3
12 RECEIVE PROTOTYPES,
INSPECT, ASSEMBLE, TEST 8 24
13 PREPARE REPORTS (TECH)
PER REPORT 2 2
TOTAL HOURS FOR REVERSE ENGINEERING FUNCTIONS
FIGURE 4: Sample cost-estimating guide (see 5.11.3). (Page 1 of 5)
64
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business