FED-STD-793B
Inspection plan:
Level S-2, SQL 4.0 percent defective.
Unit, intermediate, and shipping containers shall be secure
and free from damage. Markings on all containers shall be
securely attached, clear, and legible.
The electrical coating, upon being brushed onto a test
splice, shall demonstrate good fluidity, permitting an
effective coating of the splice.
5.6 FSC 5970 Insulation Tape, Electrical, Pressure
Sensitive Thermosetting Adhesive
Inspection plan:
Level S-2, SQL 4.0 percent defective.
Unit, intermediate, and shipping containers shall be secure
and free from damage. Markings on all containers shall be
securely attached, clear, and legible.
A short segment of tape shall be unrolled and then cut or
torn from the roll. The segment of tape shall have good
adhesion without any fraying or other damage.
5.7 FSC 5970 Insulation Tape, Electrical, Friction
Inspection plan:
Level S-2, SQL 4.0 percent defective.
Unit, intermediate, and shipping containers shall be secure
and free from damage. Markings on all containers shall be
securely attached, clear, and legible.
A short segment of tape shall be unrolled and then cut or
torn from the roll. The segment of tape shall have good
adhesion without any fraying or other damage.
5.8 FSC 6230 Light Sets, Emergency and Auxiliary
Inspection plan:
Level S-2, SQL 4.0 percent defective.
Unit, intermediate, and shipping containers shall be secure
and free from damage. Markings on all containers shall be
securely attached, clear, and legible.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business